145
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Heating equipment (except warm air furnaces) manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WM0243 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $1,814 | $7,679 |
n/a
|
WM0243 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,986 | $6,560 |
n/a
|
WM0243 #03 Y:2025 | 03 | 2025 | Reduce space conditioning during non-working hours | $15,013 | $3,550 |
n/a
|
WM0243 #02 Y:2025 | 02 | 2025 | Isolate hot or cold equipment | $65,812 | $40,930 |
n/a
|
WM0243 #01 Y:2025 | 01 | 2025 | Use waste heat from hot flue gases to preheat | $103,411 | $360,000 |
n/a
|
IC0306 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $41,459 | $20,803 | |
IC0306 #07 Y:2024 | 07 | 2024 | Use demand controller or load shedder | $1,874 | $10,418 | |
IC0306 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $158 | $432 | |
IC0306 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,340 | - | |
IC0306 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $21,638 | $33,160 | |
IC0306 #03 Y:2024 | 03 | 2024 | Replace high resistance ducts, pipes, and fittings | $2,629 | $118 | |
IC0306 #02 Y:2024 | 02 | 2024 | Utilize controls to operate equipment only when needed | $22,099 | $10,776 | |
IC0306 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $274,832 | $1,429,458 | |
TT0277 #08 Y:2022 | 08 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $812 | $1,090 | |
TT0277 #07 Y:2022 | 07 | 2022 | Utilize higher efficiency lamps and/or ballasts | $1,116 | $2,790 | |
TT0277 #06 Y:2022 | 06 | 2022 | Change rate schedules or other changes in utility service | $2,278 | $500 | |
TT0277 #05 Y:2022 | 05 | 2022 | Improve air circulation with destratification fans / other methods | $2,371 | $4,045 | |
TT0277 #04 Y:2022 | 04 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,769 | $2,815 | |
TT0277 #03 Y:2022 | 03 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $2,904 | $3,000 | |
TT0277 #02 Y:2022 | 02 | 2022 | Adopt in-house material generation | $11,462 | $31,920 |