Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Heating equipment (except warm air furnaces) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0306 #08 Y:2024 Insulate bare equipment $41,459 $20,803
IC0306 #07 Y:2024 Use demand controller or load shedder $1,874 $10,418
IC0306 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $158 $432
IC0306 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,340 -
IC0306 #04 Y:2024 Eliminate or reduce compressed air usage $21,638 $33,160
IC0306 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $2,629 $118
IC0306 #02 Y:2024 Utilize controls to operate equipment only when needed $22,099 $10,776
IC0306 #01 Y:2024 Use solar heat to make electricty $274,832 $1,429,458
TT0277 #08 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $812 $1,090
TT0277 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,116 $2,790
TT0277 #06 Y:2022 Change rate schedules or other changes in utility service $2,278 $500
TT0277 #05 Y:2022 Improve air circulation with destratification fans / other methods $2,371 $4,045
TT0277 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,769 $2,815
TT0277 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $2,904 $3,000
TT0277 #02 Y:2022 Adopt in-house material generation $11,462 $31,920
TT0277 #01 Y:2022 Insulate bare equipment $15,235 $8,435
MZ0270 #07 Y:2019 Install vinyl strip / high speed / air curtain doors $19,893 $18,000
MZ0270 #06 Y:2019 Utilize energy-efficient belts and other improved mechanisms $1,293 -
MZ0270 #05 Y:2019 Reduce the pressure of compressed air to the minimum required $235 $400
MZ0270 #04 Y:2019 Use waste heat from hot flue gases to preheat $4,815 $19,000