Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

968

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ventilation, heating, air-conditioning, and commercial refrigeration equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0992 #10 Y:2024 Replace existing chiller with high efficiency model $13,642 $39,500
GT0992 #09 Y:2024 Replace existing hvac unit with high efficiency model $58,314 $193,000
GT0992 #08 Y:2024 Turn off equipment during breaks, reduce operating time $271 $1,039
GT0992 #07 Y:2024 Use solar heat to make electricty $53,987 $203,336
GT0992 #06 Y:2024 Apply for tax-free status for energy purchases $350 $200
GT0992 #05 Y:2024 Pay utility bills on time $95 $50
GT0992 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $951 $400
GT0992 #03 Y:2024 Conserve energy by efficient use of vending machines $328 $135
GT0992 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,215 $1,850
GT0992 #01 Y:2024 Change rate schedules or other changes in utility service $2,701 $100
MI0449 #07 Y:2024 Meter waste water $1,195 $900
MI0449 #06 Y:2024 Keep doors and windows shut when not on use $1,254 $320
MI0449 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,413 $3,096
MI0449 #04 Y:2024 Lower temperature during the winter season and vice-versa $6,646 $700
MI0449 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,015 $1,980
MI0449 #02 Y:2024 Replace treated water with well / surface water $15,070 $13,480
MI0449 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $15,976 $61,998
OK1116 #06 Y:2024 Use waste heat from hot flue gases to preheat $1,007 $7,840
OK1116 #05 Y:2024 Turn off equipment when not in use $4,536 -
OK1116 #04 Y:2024 Use solar heat to make electricty $151,456 $1,065,000