Assessment Year | 2025 |
---|---|
Principal Product | HVAC filters |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
451,400
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $97,600 | 1,908,400 |
kWh
|
$0.051 | |
Electricity Demand | $70,491 | 5,810 |
kW-mo/yr
|
$12.13 | |
Natural Gas | $21,433 | 2,408 |
MMBtu
|
$8.90 | |
Waste Disposal Costs | |||||
Water Usage | $2,539 | 608 |
Tgal
|
$4.18 | |
Water Disposal | $3,168 | 608 |
Tgal
|
$5.21 | |
TOTAL YEARLY COSTS | $195,231 | ||||
RECOMMENDED SAVINGS* | $36,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $17,296 | $210,600 |
$17,296
339,136
kWh
|
- | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $2,185 | $18,260 |
$2,185
42,834
kWh
|
- | - | |
03 | 2.7211: Clean and maintain refrigerant condensers and towers | $3,106 | $5,620 |
$3,106
60,907
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $7,698 | $7,800 | - |
$7,698
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,237 | $115 |
$1,237
24,257
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,079 | $5,115 |
$3,079
60,363
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $2,256 | $2,941 | - | - | $2,256 | |
TOTAL RECOMMENDED | $36,857 | $250,451 |
$26,903
527,497
kWh
|
$7,698
-
MMBtu
|
$2,256 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs