Assessment Year | 2000 |
---|---|
Principal Product | anodizing and electroplating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $500 k to 1M |
# of Employees | 13 |
Plant Area |
9,850
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 2,535
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $7,914 | 446,659 |
kWh
|
$0.018 |
Electricity Demand | $22,949 | 1,650 |
kW-mo/yr
|
$13.91 |
Electricity Fees | $408 | - |
|
- |
Natural Gas | $22,673 | 5,407 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $2,280 | $4,000 | - |
$2,280
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2511: Insulate bare equipment | $1,970 | $2,360 |
$620
37,515
kWh
|
$980
-
kW-mo/yr
|
$370
-
MMBtu
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,550 | $5,200 |
$320
19,343
kWh
|
$1,230
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $510 | $290 |
$180
10,844
kWh
|
$690
-
kW-mo/yr
|
- | $(-360.0) | - | - | |
05 | 2.2437: Recover waste heat from equipment | $400 | $1,370 | - | - |
$400
-
MMBtu
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $280 | $60 |
$60
3,517
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $240 | $300 | - | - |
$240
-
MMBtu
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | - |
$20
879
kWh
|
$60
-
kW-mo/yr
|
- | - | $50 | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,350 | $12,000 | - | - | - | - | - | $6,350 | |
TOTAL RECOMMENDED | $13,710 | $25,580 |
$1,200
72,098
kWh
|
$5,460
-
kW-mo/yr
|
$1,010
-
MMBtu
|
$(-360.0) | $50 | $6,350 | ||
TOTAL IMPLEMENTED | $13,710 | $25,580 |
$1,200
72,098
kWh
|
$5,460
-
kW-mo/yr
|
$1,010
-
MMBtu
|
$(-360.0) | $50 | $6,350 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs