Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

513

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial and service industry machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0502 #07 Y:2013 Utilize energy-efficient belts and other improved mechanisms $39 $16
NC0502 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $408 $25
NC0502 #05 Y:2013 Eliminate or reduce compressed air usage $564 $525
NC0502 #04 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $485 $50
NC0502 #03 Y:2013 Install occupancy sensors $727 $1,218
NC0502 #02 Y:2013 Lower temperature during the winter season and vice-versa $864 $600
NC0502 #01 Y:2013 Reduce space conditioning during non-working hours $911 $1,200
OK0854 #06 Y:2013 Use or replace with energy efficient substitutes $19,559 $94,000
OK0854 #05 Y:2013 Reduce the pressure of compressed air to the minimum required $830 -
OK0854 #04 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,783 $1,188
OK0854 #03 Y:2013 Install occupancy sensors $1,391 $2,535
OK0854 #02 Y:2013 Optimize plant power factor $3,180 $6,300
OK0854 #01 Y:2013 Apply for tax-free status for energy purchases $3,342 -
CO0668 #05 Y:2013 Apply for tax-free status for energy purchases $1,950 $500
CO0668 #04 Y:2013 Change rate schedules or other changes in utility service $3,280 $500
CO0668 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $25,450 $48,290
CO0668 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $4,280 $2,040
CO0668 #01 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $11,280 $45,000
MA0708 #04 Y:2013 Reduce the pressure of compressed air to the minimum required $1,828 $3,200
MA0708 #03 Y:2013 Turn off equipment when not in use $3,140 $400