Assessment Year | 2013 |
---|---|
Principal Product | Refurbished soft drink vending |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
64,000
ft2
|
Annual Production | 12,480
pieces
|
Production Hrs. Annual | 2,150
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,281 | 540,448 |
kWh
|
$0.076 |
Electricity Demand | $13,738 | 1,788 |
kW-mo/yr
|
$7.68 |
Electricity Fees | $2,444 | - |
|
- |
Natural Gas | $28,832 | 2,576 |
MMBtu
|
$11.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,087 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $911 | $1,200 |
$911
13,203
kWh
|
- | - | - | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $864 | $600 | - | - |
$864
-
MMBtu
|
- | - | |
03 | 2.7135: Install occupancy sensors | $727 | $1,218 |
$727
8,436
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $485 | $50 |
$665
9,623
kWh
|
- | - | $(-100.0) | $(-80.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $564 | $525 |
$564
8,160
kWh
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $408 | $25 |
$217
3,145
kWh
|
$191
-
kW-mo/yr
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $39 | $16 |
$21
301
kWh
|
$18
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $3,998 | $3,634 |
$3,105
42,868
kWh
|
$209
-
kW-mo/yr
|
$864
-
MMBtu
|
$(-100.0) | $(-80.0) | ||
TOTAL IMPLEMENTED | $3,087 | $2,434 |
$2,194
29,665
kWh
|
$209
-
kW-mo/yr
|
$864
-
MMBtu
|
$(-100.0) | $(-80.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs