82
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Semiconductor machinery manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2513 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $602 | $2,234 |
n/a
|
| UL2513 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,723 | $561 |
n/a
|
| UL2513 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $57,929 | $431,966 |
n/a
|
| UL2513 #03 Y:2025 | 03 | 2025 | Use outside cold water source as a supply of cooling water | $34,574 | $58,425 |
n/a
|
| UL2513 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,535 | $1,080 |
n/a
|
| UL2513 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,366 | - |
n/a
|
| OR0787 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,370 | $11,019 | |
| OR0787 #03 Y:2024 | 03 | 2024 | Eliminate or reduce compressed air usage | $4,379 | $1,271 | |
| OR0787 #02 Y:2024 | 02 | 2024 | Re-size charging openings or add movable cover or door | $1,862 | - | |
| OR0787 #01 Y:2024 | 01 | 2024 | Replace existing hvac unit with high efficiency model | $13,182 | $130,619 | |
| SD0654 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,472 | $2,019 | |
| SD0654 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $25,573 | $12,716 | |
| SD0654 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $11,314 | $4,469 | |
| SD0654 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $12,410 | $7,109 | |
| SD0654 #03 Y:2024 | 03 | 2024 | Eliminate or reduce compressed air usage | $13,069 | $20,212 | |
| SD0654 #02 Y:2024 | 02 | 2024 | Upgrade controls on compressors | $51,545 | $70,429 | |
| SD0654 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,846 | $1,355 | |
| SF0561 #07 Y:2020 | 07 | 2020 | Use solar heat to make electricty | $35,550 | $236,909 | |
| SF0561 #06 Y:2020 | 06 | 2020 | Use cooling tower or economizer to replace chiller cooling | $5,263 | $18,437 | |
| SF0561 #05 Y:2020 | 05 | 2020 | Utilize higher efficiency lamps and/or ballasts | $2,548 | $4,226 |