ITAC Assessment: UL2513
ITAC logo
ITAC Assessment: UL2513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Polymer Films
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 57,548
ft2
Annual Production 973
ton
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,007 3,095,581
kWh
Electricity Demand $194,157 8,613
kW-mo/yr
Electricity Fees $18,894 -
Natural Gas $6,840 937
MMBtu
TOTAL YEARLY COSTS $390,898
RECOMMENDED SAVINGS* $98,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,366 - $1,366
24,726
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,535 $1,080 $2,535
45,932
kWh
-
03 2.2692: Use outside cold water source as a supply of cooling water $34,574 $58,425 $20,291
367,585
kWh
$14,283
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $57,929 $431,966 $32,664
591,294
kWh
$25,265
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,723 $561 $1,088
19,710
kWh
$635
-
kW-mo/yr
06 2.7135: Install occupancy sensors $602 $2,234 $602
10,912
kWh
-
TOTAL RECOMMENDED $98,729 $494,266 $58,546
1,060,159
kWh
$40,183
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs