ITAC Assessment: AM0694
ITAC logo
ITAC Assessment: AM0694
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pewter and zinc alloy emblems
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 90,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,690
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,355 648,720
kWh
Electricity Demand $10,922 1,969
kW-mo/yr
Natural Gas $2,144 238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,400 $9,800 - - - $8,400
02 2.7111: Reduce illumination to minimum necessary levels $1,650 $580 $985
18,410
kWh
$455
-
kW-mo/yr
- $210
03 2.6123: Remove unneeded service lines to eliminate potential leaks $1,225 - - - $1,225
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $125 $30 $85
1,560
kWh
$40
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $100 $140 $95
1,765
kWh
$5
-
kW-mo/yr
- -
TOTAL RECOMMENDED $11,500 $10,550 $1,165
21,735
kWh
$500
-
kW-mo/yr
$1,225
-
MMBtu
$8,610
TOTAL IMPLEMENTED $1,650 $580 $985
18,410
kWh
$455
-
kW-mo/yr
- $210
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs