| Assessment Year | 2017 |
|---|---|
| Principal Product | Plastic Injection Molds |
| NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $10 M to 50M |
| # of Employees | 95 |
| Plant Area |
41,100
ft2
|
| Annual Production | 180
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $113,115 | 1,639,500 |
kWh
|
$0.069 | |
| Electricity Demand | $43,597 | 3,407 |
kW-mo/yr
|
$12.80 | |
| Natural Gas | $11,129 | 1,597 |
MMBtu
|
$6.97 | |
| Waste Disposal Costs | |||||
| Water Usage | $128 | 318,000 |
Tgal
|
$0.000 | |
| Water Disposal | $155 | 318 |
Tgal
|
$0.49 | |
| TOTAL YEARLY COSTS | $168,124 | ||||
| RECOMMENDED SAVINGS* | $40,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,736 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9113: Use solar heat for heat | $23,768 | $97,975 |
$23,768
319,700
kWh
|
- | - | |
| 02 | 2.3137: Use power during off-peak periods | $10,583 | $100 | - |
$10,583
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,331 | $8,433 |
$3,280
47,545
kWh
|
$51
-
kW-mo/yr
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,153 | $890 |
$2,153
31,200
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $684 | $450 |
$346
5,010
kWh
|
- |
$338
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,519 | $107,848 |
$29,547
403,455
kWh
|
$10,634
-
kW-mo/yr
|
$338
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,736 | $990 |
$2,153
31,200
kWh
|
$10,583
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs