ITAC Assessment: TT0188
ITAC logo
ITAC Assessment: TT0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plastic Injection Molds
NAICS 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 41,100
ft2
Annual Production 180
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,115 1,639,500
kWh
Electricity Demand $43,597 3,407
kW-mo/yr
Natural Gas $11,129 1,597
MMBtu
Waste Disposal Costs
Water Usage $128 318,000
Tgal
Water Disposal $155 318
Tgal
TOTAL YEARLY COSTS $168,124
RECOMMENDED SAVINGS* $40,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9113: Use solar heat for heat $23,768 $97,975 $23,768
319,700
kWh
- -
02 2.3137: Use power during off-peak periods $10,583 $100 - $10,583
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,331 $8,433 $3,280
47,545
kWh
$51
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,153 $890 $2,153
31,200
kWh
- -
05 2.7261: Install timers and/or thermostats $684 $450 $346
5,010
kWh
- $338
-
MMBtu
TOTAL RECOMMENDED $40,519 $107,848 $29,547
403,455
kWh
$10,634
-
kW-mo/yr
$338
-
MMBtu
TOTAL IMPLEMENTED $12,736 $990 $2,153
31,200
kWh
$10,583
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs