ITAC Assessment: LE0244
ITAC logo
ITAC Assessment: LE0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product newspaper advertising inserts
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 149,717
ft2
Annual Production 1,889,712,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $897,480 20,679,155
kWh
Electricity Demand $378,026 39,584
kW-mo/yr
Natural Gas $1,305,019 119,292
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $135,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,350 $1,000 $14,327
333,172
kWh
$5,023
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,690 $1,000 $14,321
333,051
kWh
$4,369
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $15,950 $1,024 $11,108
258,337
kWh
$4,842
-
kW-mo/yr
04 2.4112: Install soft-start to eliminate nuisance trips $13,305 $42,000 - $13,305
-
kW-mo/yr
05 2.7221: Lower temperature during the winter season and vice-versa $7,705 $50 $4,784
111,289
kWh
$2,921
-
kW-mo/yr
06 2.7272: Install heat pipes / raise cooling setpoint $2,252 $50 $1,725
40,126
kWh
$527
-
kW-mo/yr
07 2.7135: Install occupancy sensors $4,751 $450 $4,751
110,475
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $61,139 $68,713 $46,846
1,089,484
kWh
$14,293
-
kW-mo/yr
TOTAL RECOMMENDED $143,142 $114,287 $97,862
2,275,934
kWh
$45,280
-
kW-mo/yr
TOTAL IMPLEMENTED $135,437 $114,237 $93,078
2,164,645
kWh
$42,359
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs