ITAC Assessment: SJ0049
ITAC logo
ITAC Assessment: SJ0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Automation equipment
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 60,000
ft2
Annual Production 60
units
Production Hrs. Annual 1,700
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,968 774,001
kWh
Electricity Demand $48,224 2,194
kW-mo/yr
Natural Gas $10,182 437
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $14,874 39
gal
TOTAL YEARLY COSTS $283,248
RECOMMENDED SAVINGS* $136,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,275 $15,290 $10,285
37,872
kWh
$4,990
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $862 $2,033 - - $862
-
MMBtu
03 2.2522: Isolate hot or cold equipment $7,402 $3,682 $7,402
27,258
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $4,177 - $4,177
15,414
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $6,174 $26,353 $5,850
21,584
kWh
$324
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $5,009 - $553
2,041
kWh
- $4,456
-
MMBtu
07 2.9114: Use solar heat to make electricty $97,782 $111,738 $90,488
333,903
kWh
$7,294
-
kW-mo/yr
-
TOTAL RECOMMENDED $136,681 $159,096 $118,755
438,072
kWh
$12,608
-
kW-mo/yr
$5,318
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs