ITAC Assessment: GT0429
ITAC logo
ITAC Assessment: GT0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product T-SHIRTS (BRANDED)
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area
n/a
Annual Production 7,700,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,835 1,300,117
kWh
Natural Gas $7,230 1,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $788 $209 $788
13,482
kWh
-
02 2.4133: Use most efficient type of electric motors $150 $1,130 $150
2,638
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,175 $1,600 $3,175
53,634
kWh
-
04 2.7421: Reduce glazed areas in buildings $1,806 $10,500 $1,143
29,015
kWh
$663
-
MMBtu
TOTAL RECOMMENDED $5,919 $13,439 $5,256
98,769
kWh
$663
-
MMBtu
TOTAL IMPLEMENTED $5,919 $13,439 $5,256
98,769
kWh
$663
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs