ITAC Assessment: IP0080
ITAC logo
ITAC Assessment: IP0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sanding back-up pads
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 11,869
ft2
Annual Production 2,100,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,286 1,130,160
kWh
Electricity Demand $55,845 2,281
kW-mo/yr
Electricity Fees $569 -
Natural Gas $22,183 4,485
MMBtu
TOTAL YEARLY COSTS $112,883
RECOMMENDED SAVINGS* $16,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,474 $25 $1,564
51,533
kWh
- $4,910
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $6,305 $155 - - $6,305
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $985 $40 $183
6,030
kWh
$802
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $200 $200 $200
6,569
kWh
- -
05 2.7135: Install occupancy sensors $194 $208 $194
6,393
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,290 $5,520 $422
13,900
kWh
$1,868
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,448 $6,148 $2,563
84,425
kWh
$2,670
-
kW-mo/yr
$11,215
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs