| Assessment Year | 2017 |
|---|---|
| Principal Product | Sanding back-up pads |
| NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
| SIC | 3086: Plastics Foam Products |
| Sales Range | $5 M to 10M |
| # of Employees | 41 |
| Plant Area |
11,869
ft2
|
| Annual Production | 2,100,000
pieces
|
| Production Hrs. Annual | 2,184
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,286 | 1,130,160 |
kWh
|
$0.030 |
| Electricity Demand | $55,845 | 2,281 |
kW-mo/yr
|
$24.48 |
| Electricity Fees | $569 | - |
|
- |
| Natural Gas | $22,183 | 4,485 |
MMBtu
|
$4.95 |
| TOTAL YEARLY COSTS | $112,883 | |||
| RECOMMENDED SAVINGS* | $16,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $6,474 | $25 |
$1,564
51,533
kWh
|
- |
$4,910
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $6,305 | $155 | - | - |
$6,305
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $985 | $40 |
$183
6,030
kWh
|
$802
-
kW-mo/yr
|
- | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $200 | $200 |
$200
6,569
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $194 | $208 |
$194
6,393
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,290 | $5,520 |
$422
13,900
kWh
|
$1,868
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $16,448 | $6,148 |
$2,563
84,425
kWh
|
$2,670
-
kW-mo/yr
|
$11,215
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs