ITAC Assessment: SD0654
ITAC logo
ITAC Assessment: SD0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automated Microelectronic Assembly Machines
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 67,528
ft2
Annual Production 45
units
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,767 875,919
kWh
Electricity Demand $185,991 2,351
kW-mo/yr
Electricity Fees $(-152,031.0) -
Natural Gas $16,783 1,010
MMBtu
TOTAL YEARLY COSTS $326,510
RECOMMENDED SAVINGS* $119,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,846 $1,355 $1,083
3,440
kWh
$763
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $51,545 $70,429 $31,833
101,120
kWh
$19,712
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $13,069 $20,212 - $13,069
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,410 $7,109 $12,410
39,423
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,314 $4,469 $6,639
21,088
kWh
$4,675
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $25,573 $12,716 $15,142
48,101
kWh
$10,339
-
kW-mo/yr
$92
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,472 $2,019 $2,325
7,387
kWh
$1,147
-
kW-mo/yr
-
TOTAL RECOMMENDED $119,229 $118,309 $69,432
220,559
kWh
$49,705
-
kW-mo/yr
$92
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs