ITAC Assessment: LE0506
ITAC logo
ITAC Assessment: LE0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Non-Dairy Beverages
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,105 6,922,000
kWh
Electricity Demand $37,331 9,368
kW-mo/yr
Electricity Fees $88,025 -
Natural Gas $666,090 129,774
MMBtu
TOTAL YEARLY COSTS $1,157,551
RECOMMENDED SAVINGS* $178,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,556 $11,500 $23,162
437,026
kWh
$2,394
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,519 $5,000 $7,721
145,675
kWh
$798
-
kW-mo/yr
-
03 2.2442: Preheat combustion air with waste heat $36,412 $80,000 - - $36,412
-
MMBtu
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $108,239 $800,000 $185,203
3,494,400
kWh
$19,152
-
kW-mo/yr
$(-96,116.0)
-
MMBtu
TOTAL RECOMMENDED $178,726 $896,500 $216,086
4,077,101
kWh
$22,344
-
kW-mo/yr
$(-59,704.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs