matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0305 #01 Y:2010 | 01 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $786 | $196 | |
| UM0380 #09 Y:2010 | 09 | 2010 | Preheat combustion air with waste heat | $273 | $1,400 | |
| UM0380 #08 Y:2010 | 08 | 2010 | Recover waste heat from equipment | $1,714 | $1,500 | |
| UM0380 #07 Y:2010 | 07 | 2010 | Recover heat from exhausted steam, hot air or hot water | $3,245 | $5,500 | |
| UM0380 #06 Y:2010 | 06 | 2010 | Use heat pump for space conditioning | $7,702 | $217,800 | |
| UM0380 #05 Y:2010 | 05 | 2010 | Insulate glazing, walls, ceilings, and roofs | $6,024 | $14,751 | |
| UM0380 #04 Y:2010 | 04 | 2010 | Use direct flame impingement or infrared processing for chamber type heating | $21,456 | $250,000 | |
| UM0380 #03 Y:2010 | 03 | 2010 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $30,357 | $350,000 | |
| UM0380 #02 Y:2010 | 02 | 2010 | Install compressor air intakes in coolest locations | $861 | $3,000 | |
| UM0380 #01 Y:2010 | 01 | 2010 | Install occupancy sensors | $2,880 | $2,484 | |
| LE0302 #10 Y:2010 | 10 | 2010 | Install occupancy sensors | $1,414 | $300 | |
| LE0302 #09 Y:2010 | 09 | 2010 | Utilize higher efficiency lamps and/or ballasts | $6,383 | $15,780 | |
| LE0302 #08 Y:2010 | 08 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $1,646 | $480 | |
| LE0302 #07 Y:2010 | 07 | 2010 | Recover waste heat from equipment | $18,237 | $12,000 | |
| LE0302 #06 Y:2010 | 06 | 2010 | Repair or replace steam traps | $46,342 | $10,000 | |
| LE0302 #05 Y:2010 | 05 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,786 | $1,720 | |
| LE0302 #04 Y:2010 | 04 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $18,289 | $6,000 | |
| LE0302 #03 Y:2010 | 03 | 2010 | Repair faulty insulation in furnaces, boilers, etc | $19,885 | $35,220 | |
| LE0302 #02 Y:2010 | 02 | 2010 | Use optimum size and capacity equipment | $43,590 | $6,000 | |
| LE0302 #01 Y:2010 | 01 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $100,844 | $52,100 |