ITAC Assessment: SU0305
ITAC logo
ITAC Assessment: SU0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Manufacturing Converting Machinery
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 123,246
ft2
Annual Production 20
units
Production Hrs. Annual 5,460
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,794 2,257,844
kWh
Electricity Demand $104,241 6,922
kW-mo/yr
Electricity Fees $7,040 -
Natural Gas $146,994 16,585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $786 $196 $786
10,920
kWh
- - -
02 2.6211: Conserve energy by efficient use of vending machines $344 $645 $344
4,780
kWh
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $12,040 $34,682 $(-924.0)
(-12,830)
kWh
- - $12,964
-
MMBtu
04 2.3212: Optimize plant power factor $4,313 $16,531 - - $4,313 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,642 $60,207 $6,739
93,603
kWh
$4,903
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,125 $112,261 $6,945
96,473
kWh
$4,903
-
kW-mo/yr
$4,313 $12,964
-
MMBtu
TOTAL IMPLEMENTED $11,986 $60,852 $7,083
98,383
kWh
$4,903
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs