ITAC Assessment: UM0380
ITAC logo
ITAC Assessment: UM0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Paint Mixing Products
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 93,300
ft2
Annual Production 1
units
Production Hrs. Annual 2,184
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,548 729,770
kWh
Natural Gas $76,224 7,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $2,880 $2,484 $2,880
28,069
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $861 $3,000 $861
8,396
kWh
- -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $30,357 $350,000 - $30,357 -
04 2.5113: Use direct flame impingement or infrared processing for chamber type heating $21,456 $250,000 - - $21,456
-
MMBtu
05 2.7491: Insulate glazing, walls, ceilings, and roofs $6,024 $14,751 - - $6,024
-
MMBtu
06 2.7234: Use heat pump for space conditioning $7,702 $217,800 - - $7,702
-
MMBtu
07 2.2449: Recover heat from exhausted steam, hot air or hot water $3,245 $5,500 - - $3,245
-
MMBtu
08 2.2437: Recover waste heat from equipment $1,714 $1,500 - - $1,714
-
MMBtu
09 2.2442: Preheat combustion air with waste heat $273 $1,400 - - $273
-
MMBtu
TOTAL RECOMMENDED $74,512 $846,435 $3,741
36,465
kWh
$30,357 $40,414
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs