Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0144 #05 Y:2021 Shut off air conditioning in winter heating season $5,985 $6,222
BS0144 #04 Y:2021 Cover open tanks $495 $547
BS0144 #03 Y:2021 Reduce space conditioning during non-working hours $405 $579
BS0144 #02 Y:2021 Reduce space conditioning during non-working hours $260 $159
BS0144 #01 Y:2021 Replace fossil fuel equipment with electrical equipment $2,152 $180
AM0816 #07 Y:2021 Turn off equipment when not in use $120 -
AM0816 #06 Y:2021 Use synthetic lubricant $230 $150
AM0816 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $1,510 $15
AM0816 #04 Y:2021 Establish a predictive maintenance program $1,250 $4,570
AM0816 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,750 $1,150
AM0816 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $11,430 $11,910
AM0816 #01 Y:2021 Apply for tax-free status for energy purchases $42,750 $3,000
SF0561 #07 Y:2020 Use solar heat to make electricty $35,550 $236,909
SF0561 #06 Y:2020 Use cooling tower or economizer to replace chiller cooling $5,263 $18,437
SF0561 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $2,548 $4,226
SF0561 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $2,435 $3,959
SF0561 #03 Y:2020 Insulate bare equipment $3,116 $1,412
SF0561 #02 Y:2020 Reduce the pressure of compressed air to the minimum required $1,203 $110
SF0561 #01 Y:2020 Utilize controls to operate equipment only when needed $5,397 $525
UD1019 #08 Y:2020 Utilize higher efficiency lamps and/or ballasts $3,469 $10,920