| Assessment Year | 2021 |
|---|---|
| Principal Product | Carbide Tooling |
| NAICS | 333249: Other Industrial Machinery Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
50,000
ft2
|
| Annual Production | 340,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $166,375 | 3,614,659 |
kWh
|
$0.046 |
| Electricity Demand | $46,196 | 7,215 |
kW-mo/yr
|
$6.40 |
| Electricity Fees | $13,114 | - |
|
- |
| Natural Gas | $4,682 | 886 |
MMBtu
|
$5.28 |
| TOTAL YEARLY COSTS | $230,367 | |||
| RECOMMENDED SAVINGS* | $11,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,152 | $180 |
$(-38.0)
(-821)
kWh
|
- |
$2,190
-
MMBtu
|
|
| 02 | 2.7224: Reduce space conditioning during non-working hours | $260 | $159 |
$62
1,355
kWh
|
- |
$198
-
MMBtu
|
|
| 03 | 2.7224: Reduce space conditioning during non-working hours | $405 | $579 |
$405
8,804
kWh
|
- | - | |
| 04 | 2.2514: Cover open tanks | $495 | $547 |
$416
9,040
kWh
|
$79
-
kW-mo/yr
|
- | |
| 05 | 2.6215: Shut off air conditioning in winter heating season | $5,985 | $6,222 |
$5,985
130,032
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,776 | $452 |
$1,492
32,412
kWh
|
$284
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $11,073 | $8,139 |
$8,322
180,822
kWh
|
$363
-
kW-mo/yr
|
$2,388
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs