Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

590

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mining and oil and gas field machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1024 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $5,608 $4,500
OK1024 #02 Y:2019 Recover waste heat from equipment $6,084 $2,187
OK1024 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $3,729 -
NL0035 #06 Y:2019 Install compressor air intakes in coolest locations $825 $2,025
NL0035 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,450 $1,600
NL0035 #04 Y:2019 Change rate schedules or other changes in utility service $1,867 -
NL0035 #03 Y:2019 Use / purchase optimum sized compressor $8,170 $35,828
NL0035 #02 Y:2019 Improve air circulation with destratification fans / other methods $16,935 $18,980
NL0035 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $36,555 $34,820
OK1007 #05 Y:2019 Initiate a total quality management program $96,866 $35,244
OK1007 #04 Y:2019 Optimize plant power factor $2,995 $1,980
OK1007 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $9,238 -
OK1007 #02 Y:2019 Install compressor air intakes in coolest locations $390 $1,047
OK1007 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $9,929 $3,017
WM0131 #09 Y:2018 Utilize higher efficiency lamps and/or ballasts $455 $600
WM0131 #08 Y:2018 Make a practice of turning off lights when not needed $2,915 -
WM0131 #07 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $4,069 $1,500
WM0131 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $4,086 $4,750
WM0131 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $13,174 $15,938
WM0131 #04 Y:2018 Use synthetic lubricant $14,757 $10,000