| Assessment Year | 2019 |
|---|---|
| Principal Product | Gears for Mining Equipment |
| NAICS | 333131: Mining Machinery and Equipment Manufacturing |
| SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 850 |
| Plant Area |
1,150,000
ft2
|
| Annual Production | 1,000
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,193,430 | 19,587,120 |
kWh
|
$0.061 | |
| Electricity Demand | $453,390 | 33,094 |
kW-mo/yr
|
$13.70 | |
| Electricity Fees | $32,940 | - |
|
- | |
| Natural Gas | $757,050 | 162,457 |
MMBtu
|
$4.66 | |
| Waste Disposal Costs | |||||
| Water Usage | $200,000 | 43,000 |
Tgal
|
$4.65 | |
| TOTAL YEARLY COSTS | $2,636,810 | ||||
| RECOMMENDED SAVINGS* | $109,494 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $43,896 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $33,801 | - | - | - |
$33,801
-
MMBtu
|
- | |
| 02 | 2.9114: Use solar heat to make electricty | $18,168 | $105,757 |
$18,168
276,867
kWh
|
- | - | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $18,069 | $5,612 | - | - |
$18,069
-
MMBtu
|
- | |
| 04 | 2.4314: Use synthetic lubricant | $14,757 | $10,000 |
$11,167
183,292
kWh
|
$3,590
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,174 | $15,938 |
$9,971
163,649
kWh
|
$3,203
-
kW-mo/yr
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,086 | $4,750 |
$3,093
50,758
kWh
|
$994
-
kW-mo/yr
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,069 | $1,500 |
$3,082
50,542
kWh
|
$987
-
kW-mo/yr
|
- | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $2,915 | - |
$2,230
36,599
kWh
|
$685
-
kW-mo/yr
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $455 | $600 |
$256
4,205
kWh
|
$79
-
kW-mo/yr
|
- | $120 | |
| TOTAL RECOMMENDED | $109,494 | $144,157 |
$47,967
765,912
kWh
|
$9,537
-
kW-mo/yr
|
$51,870
-
MMBtu
|
$120 | ||
| TOTAL IMPLEMENTED | $43,896 | $21,862 |
$19,572
321,191
kWh
|
$6,256
-
kW-mo/yr
|
$18,069
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs