ITAC Assessment: SD0294
ITAC logo
ITAC Assessment: SD0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product beer
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 20,000
ft2
Annual Production 20,000
bbl
Production Hrs. Annual 3,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,167 310,080
kWh
Electricity Demand $12,301 1,085
kW-mo/yr
Electricity Fees $537 -
Natural Gas $42,120 3,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2441: Preheat boiler makeup water with waste process heat $9,512 $6,000 - $9,512
-
MMBtu
-
02 2.2522: Isolate hot or cold equipment $3,123 $5,200 $3,123
21,945
kWh
- -
03 2.1221: Replace obsolete burners with more efficient ones $4,969 $2,000 - $4,969
-
MMBtu
-
04 2.2694: Use highest temperature for chilling or cold storage $501 $20 $501
12
kWh
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $10,904 $2,000 - - $10,904
-
Tgal
TOTAL RECOMMENDED $29,009 $15,220 $3,624
21,957
kWh
$14,481
-
MMBtu
$10,904
-
Tgal
TOTAL IMPLEMENTED $10,904 $2,000 - - $10,904
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs