ITAC Assessment: OK1024
ITAC logo
ITAC Assessment: OK1024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Oil and gas field machinery and equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 250,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,730
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,777 3,383,922
kWh
Natural Gas $133,776 19,976
MMBtu
Waste Disposal Costs
Water Usage $5,777 2,275
Tgal
TOTAL YEARLY COSTS $508,330
RECOMMENDED SAVINGS* $51,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,729 - $3,729
34,215
kWh
-
02 2.2437: Recover waste heat from equipment $6,084 $2,187 - $6,084
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,608 $4,500 $5,608
51,450
kWh
-
04 2.7211: Clean and maintain refrigerant condensers and towers $515 $540 $515
4,718
kWh
-
05 2.7241: Install outside air damper / economizer on hvac unit $1,437 $3,178 $1,437
13,186
kWh
-
06 2.7261: Install timers and/or thermostats $34,324 $2,448 - $34,324
-
MMBtu
TOTAL RECOMMENDED $51,697 $12,853 $11,289
103,569
kWh
$40,408
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs