Assessment Year | 2004 |
---|---|
Principal Product | Miscellaneous aerospace parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
140,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $211,193 | 7,433,728 |
kWh
|
$0.028 |
Electricity Demand | $180,131 | 14,094 |
kW-mo/yr
|
$12.78 |
Electricity Fees | $192 | - |
|
- |
Natural Gas | $28,304 | 5,381 |
MMBtu
|
$5.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,390 | $600 |
$3,960
138,500
kWh
|
$2,430
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,300 | $1,860 |
$2,300
80,500
kWh
|
- | - | - | - | - | - | |
03 | 2.9112: Use solar heat to heat water | $970 | $3,780 | - | - |
$970
-
MMBtu
|
- | - | - | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $530 | $250 | - | - | - |
$90
-
Tgal
|
- | - |
$440
-
Tgal
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,380 | $52,440 |
$15,510
541,600
kWh
|
$9,480
-
kW-mo/yr
|
- | - | - | $(-4,610.0) | - | |
06 | 2.7134: Use photocell controls | $4,900 | $18,630 |
$2,620
91,300
kWh
|
$1,880
-
kW-mo/yr
|
- | - | $130 | $270 | - | |
TOTAL RECOMMENDED | $35,470 | $77,560 |
$24,390
851,900
kWh
|
$13,790
-
kW-mo/yr
|
$970
-
MMBtu
|
$90
-
Tgal
|
$130 | $(-4,340.0) |
$440
-
Tgal
|
||
TOTAL IMPLEMENTED | $34,500 | $73,780 |
$24,390
851,900
kWh
|
$13,790
-
kW-mo/yr
|
- |
$90
-
Tgal
|
$130 | $(-4,340.0) |
$440
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs