ITAC Assessment: CO0542
ITAC logo
ITAC Assessment: CO0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Miscellaneous aerospace parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,193 7,433,728
kWh
Electricity Demand $180,131 14,094
kW-mo/yr
Electricity Fees $192 -
Natural Gas $28,304 5,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,390 $600 $3,960
138,500
kWh
$2,430
-
kW-mo/yr
- - - - -
02 2.6212: Turn off equipment during breaks, reduce operating time $2,300 $1,860 $2,300
80,500
kWh
- - - - - -
03 2.9112: Use solar heat to heat water $970 $3,780 - - $970
-
MMBtu
- - - -
04 3.4114: Replace city water with recycled water via cooling tower $530 $250 - - - $90
-
Tgal
- - $440
-
Tgal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20,380 $52,440 $15,510
541,600
kWh
$9,480
-
kW-mo/yr
- - - $(-4,610.0) -
06 2.7134: Use photocell controls $4,900 $18,630 $2,620
91,300
kWh
$1,880
-
kW-mo/yr
- - $130 $270 -
TOTAL RECOMMENDED $35,470 $77,560 $24,390
851,900
kWh
$13,790
-
kW-mo/yr
$970
-
MMBtu
$90
-
Tgal
$130 $(-4,340.0) $440
-
Tgal
TOTAL IMPLEMENTED $34,500 $73,780 $24,390
851,900
kWh
$13,790
-
kW-mo/yr
- $90
-
Tgal
$130 $(-4,340.0) $440
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs