ITAC Assessment: OK1007
ITAC logo
ITAC Assessment: OK1007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bow spring centralizers
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 68,000
ft2
Annual Production 332,800
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,718 1,624,409
kWh
Electricity Demand $57,921 5,511
kW-mo/yr
Natural Gas $78,335 24,103
MMBtu
Waste Disposal Costs
Water Usage $4,250 297
Tgal
TOTAL YEARLY COSTS $228,224
RECOMMENDED SAVINGS* $119,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,929 $3,017 $7,053
130,604
kWh
$2,876
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $390 $1,047 $390
7,234
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,238 - $9,238
171,073
kWh
- - -
04 2.3212: Optimize plant power factor $2,995 $1,980 - - $2,995 -
05 4.711: Initiate a total quality management program $96,866 $35,244 - - - $96,866
TOTAL RECOMMENDED $119,418 $41,288 $16,681
308,911
kWh
$2,876
-
kW-mo/yr
$2,995 $96,866
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs