348
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Construction machinery manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS2605 #06 Y:2026 | 06 | 2026 | Replace fossil fuel equipment with electrical equipment | $78,865 | $433,647 |
n/a
|
| LS2605 #05 Y:2026 | 05 | 2026 | Upgrade controls on compressors | $2,498 | $12,500 |
n/a
|
| LS2605 #04 Y:2026 | 04 | 2026 | Install sub-metering equipment | $6,258 | $5,250 |
n/a
|
| LS2605 #03 Y:2026 | 03 | 2026 | Clean and maintain refrigerant condensers and towers | $1,247 | $490 |
n/a
|
| LS2605 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $365 | $45 |
n/a
|
| LS2605 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,280 | $25 |
n/a
|
| MS0454 #04 Y:2025 | 04 | 2025 | Re-size charging openings or add movable cover or door | $12,383 | - |
n/a
|
| MS0454 #03 Y:2025 | 03 | 2025 | Replace treated water with well / surface water | $18,747 | $35,952 |
n/a
|
| MS0454 #02 Y:2025 | 02 | 2025 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $11,257 | $1,712 |
n/a
|
| MS0454 #01 Y:2025 | 01 | 2025 | Purchase equipment instead of leasing | $85,200 | $140,028 |
n/a
|
| WM0244 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,099 | $1,720 | |
| WM0244 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $1,421 | $2,740 | |
| WM0244 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,400 | $4,125 | |
| WM0244 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $22,838 | - | |
| NL0108 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $686 | $1,621 |
n/a
|
| NL0108 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,935 | $695 |
n/a
|
| NL0108 #02 Y:2025 | 02 | 2025 | Upgrade obsolete equipment | $93,844 | $220,000 |
n/a
|
| NL0108 #01 Y:2025 | 01 | 2025 | Add equipment/ operators to reduce production bottleneck | $510,000 | $2,500,000 |
n/a
|
| NL0095 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $647 | $2,000 | |
| NL0095 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $652 | $373 |