| Assessment Year | 2026 |
|---|---|
| Principal Product | Logging vehicles |
| NAICS | 333120: Construction Machinery Manufacturing |
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 165 |
| Plant Area |
118,313
ft2
|
| Annual Production | 70
units
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $136,299 | 1,857,520 |
kWh
|
$0.073 | |
| Electricity Demand | $50,152 | 5,462 |
kW-mo/yr
|
$9.18 | |
| Electricity Fees | $31,738 | - |
|
- | |
| Natural Gas | $96,514 | 12,040 |
MMBtu
|
$8.02 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,433 | 403 |
Tgal
|
$18.44 | |
| TOTAL YEARLY COSTS | $322,136 | ||||
| RECOMMENDED SAVINGS* | $279,308 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $2,242 | - |
$2,242
30,551
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,254 | $1,357 |
$2,254
30,715
kWh
|
- | - | - | |
| 03 | 4.112: Replace old machine with new automatic multi-station tool | $149,890 | $178,000 |
$(-110.0)
(-1,500)
kWh
|
- | $150,000 | - | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $54,404 | $244,570 |
$3,462
47,177
kWh
|
$1,067
-
kW-mo/yr
|
- | $49,875 | |
| 05 | 2.9114: Use solar heat to make electricty | $70,518 | $1,545,080 |
$58,093
791,754
kWh
|
$12,425
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $279,308 | $1,969,007 |
$65,941
898,697
kWh
|
$13,492
-
kW-mo/yr
|
$150,000 | $49,875 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs