ITAC Assessment: OR0833
ITAC logo
ITAC Assessment: OR0833
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Logging vehicles
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 165
Plant Area 118,313
ft2
Annual Production 70
units
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,299 1,857,520
kWh
Electricity Demand $50,152 5,462
kW-mo/yr
Electricity Fees $31,738 -
Natural Gas $96,514 12,040
MMBtu
Waste Disposal Costs
Water Usage $7,433 403
Tgal
TOTAL YEARLY COSTS $322,136
RECOMMENDED SAVINGS* $279,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $2,242 - $2,242
30,551
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,254 $1,357 $2,254
30,715
kWh
- - -
03 4.112: Replace old machine with new automatic multi-station tool $149,890 $178,000 $(-110.0)
(-1,500)
kWh
- $150,000 -
04 4.652: Replace existing equipment with more suitable substitutes $54,404 $244,570 $3,462
47,177
kWh
$1,067
-
kW-mo/yr
- $49,875
05 2.9114: Use solar heat to make electricty $70,518 $1,545,080 $58,093
791,754
kWh
$12,425
-
kW-mo/yr
- -
TOTAL RECOMMENDED $279,308 $1,969,007 $65,941
898,697
kWh
$13,492
-
kW-mo/yr
$150,000 $49,875
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs