ITAC Assessment: OR0381
ITAC logo
ITAC Assessment: OR0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Canned and pureed fruit
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 170,000
ft2
Annual Production 8,300,000
lb
Production Hrs. Annual 4,223
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,664 1,650,938
kWh
Electricity Demand $14,948 69,132
kW-mo/yr
Natural Gas $54,311 11,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,905

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
01 3.7141: Improve cleaning efficiency by maintaining cleaning system $27,260 - - - - $12,460
-
gal
- $14,800 -
02 2.1231: Establish burner maintenance schedule for boilers $699 $300 - - $699
-
MMBtu
- - - -
03 2.2511: Insulate bare equipment $540 $345 - - $540
-
MMBtu
- - - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,850 $8,600 $(-433.0)
(-14,361)
kWh
$(-197.0)
-
kW-mo/yr
- - - - $4,480
-
Tgal
05 3.4156: Use flow control valves on equipment to optimize water use $1,096 $390 - - - - - - $1,096
-
Tgal
06 4.441: Install automatic packing equipment $20,970 $40,500 - - - - $20,970 - -
TOTAL RECOMMENDED $54,415 $50,135 $(-433.0)
(-14,361)
kWh
$(-197.0)
-
kW-mo/yr
$1,239
-
MMBtu
$12,460
-
gal
$20,970 $14,800 $5,576
-
Tgal
TOTAL IMPLEMENTED $32,905 $9,290 $(-433.0)
(-14,361)
kWh
$(-197.0)
-
kW-mo/yr
$699
-
MMBtu
$12,460
-
gal
- $14,800 $5,576
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs