| Assessment Year | 2000 |
|---|---|
| Principal Product | Canned and pureed fruit |
| NAICS |
n/a
|
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
170,000
ft2
|
| Annual Production | 8,300,000
lb
|
| Production Hrs. Annual | 4,223
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,664 | 1,650,938 |
kWh
|
$0.037 |
| Electricity Demand | $14,948 | 69,132 |
kW-mo/yr
|
$0.22 |
| Natural Gas | $54,311 | 11,142 |
MMBtu
|
$4.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,415 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,905 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.7141: Improve cleaning efficiency by maintaining cleaning system | $27,260 | - | - | - | - |
$12,460
-
gal
|
- | $14,800 | - | |
| 02 | 2.1231: Establish burner maintenance schedule for boilers | $699 | $300 | - | - |
$699
-
MMBtu
|
- | - | - | - | |
| 03 | 2.2511: Insulate bare equipment | $540 | $345 | - | - |
$540
-
MMBtu
|
- | - | - | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,850 | $8,600 |
$(-433.0)
(-14,361)
kWh
|
$(-197.0)
-
kW-mo/yr
|
- | - | - | - |
$4,480
-
Tgal
|
|
| 05 | 3.4156: Use flow control valves on equipment to optimize water use | $1,096 | $390 | - | - | - | - | - | - |
$1,096
-
Tgal
|
|
| 06 | 4.441: Install automatic packing equipment | $20,970 | $40,500 | - | - | - | - | $20,970 | - | - | |
| TOTAL RECOMMENDED | $54,415 | $50,135 |
$(-433.0)
(-14,361)
kWh
|
$(-197.0)
-
kW-mo/yr
|
$1,239
-
MMBtu
|
$12,460
-
gal
|
$20,970 | $14,800 |
$5,576
-
Tgal
|
||
| TOTAL IMPLEMENTED | $32,905 | $9,290 |
$(-433.0)
(-14,361)
kWh
|
$(-197.0)
-
kW-mo/yr
|
$699
-
MMBtu
|
$12,460
-
gal
|
- | $14,800 |
$5,576
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs