ITAC Assessment: OK0322
ITAC logo
ITAC Assessment: OK0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TABLES AND BOOKSHELVES
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 250,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,224 1,759,086
kWh
Natural Gas $51,746 17,462
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $14,518 - $14,518
-
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $666 - $876
35,463
kWh
- $(-210.0)
03 2.4239: Eliminate or reduce compressed air usage $643 $825 $643
26,084
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $594 $823 - $594
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $418 $448 $418
7,913
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $375 $185 $375
7,034
kWh
- -
TOTAL RECOMMENDED $17,214 $2,281 $16,830
76,494
kWh
$594
-
MMBtu
$(-210.0)
TOTAL IMPLEMENTED $793 $633 $793
14,947
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs