Assessment Year | 2017 |
---|---|
Principal Product | Polymer Modifiers |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
100,000
ft2
|
Annual Production | 7,000,000
units
|
Production Hrs. Annual | 6,528
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,607 | 2,091,768 |
kWh
|
$0.072 |
Electricity Demand | $8,538 | 491 |
kW-mo/yr
|
$17.39 |
Electricity Fees | $7,079 | - |
|
- |
Natural Gas | $440 | 20 |
MMBtu
|
$22.00 |
TOTAL YEARLY COSTS | $166,664 | |||
RECOMMENDED SAVINGS* | $65,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,170 | $4,000 |
$3,170
26,190
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,710 | $18,000 |
$10,710
88,520
kWh
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,810 | $6,000 |
$5,810
48,030
kWh
|
|
04 | 2.4322: Use or replace with energy efficient substitutes | $3,550 | $8,000 |
$3,550
29,380
kWh
|
|
05 | 2.2521: Isolate steam lines to avoid heating air conditioned areas | $5,100 | $10,000 |
$5,100
42,130
kWh
|
|
06 | 2.6242: Minimize operation of equipment maintained in standby condition | $10,800 | - |
$10,800
89,250
kWh
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $10,500 | $25,000 |
$10,500
86,776
kWh
|
|
08 | 3.4156: Use flow control valves on equipment to optimize water use | $630 | $2,000 |
$630
5,200
kWh
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,220 | $34,080 |
$15,220
125,800
kWh
|
|
TOTAL RECOMMENDED | $65,490 | $107,080 |
$65,490
541,276
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs