ITAC Assessment: MS0454
ITAC logo
ITAC Assessment: MS0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Step Drill Bits
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 236
Plant Area 150,000
ft2
Annual Production 10,600,000
units
Production Hrs. Annual 3,640
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $785,544 10,170,468
kWh
Electricity Demand $110,992 19,459
kW-mo/yr
Electricity Fees $(-10,027.2) -
Waste Disposal Costs
Water Usage $18,747 106,618
Tgal
TOTAL YEARLY COSTS $905,255
RECOMMENDED SAVINGS* $2,420,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.231: Purchase equipment instead of leasing $85,200 $140,028 - - - $85,200 -
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,257 $1,712 $11,257
146,200
kWh
- - - -
03 3.4159: Replace treated water with well / surface water $18,747 $64,200 - - $18,747
-
Tgal
- -
04 4.111: Add equipment/ operators to reduce production bottleneck $2,292,500 $1,179,452 - - - - $2,292,500
05 2.2531: Re-size charging openings or add movable cover or door $12,383 - $11,902
154,574
kWh
$481
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $2,420,087 $1,385,392 $23,159
300,774
kWh
$481
-
kW-mo/yr
$18,747
-
Tgal
$85,200 $2,292,500
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs