ITAC Assessment: MU0024
ITAC logo
ITAC Assessment: MU0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Coating Pieces
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 23,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,378 3,525,312
kWh
Electricity Demand $52,940 8,134
kW-mo/yr
Electricity Fees $44,803 -
Natural Gas $11,727 1,082
MMBtu
TOTAL YEARLY COSTS $350,848
RECOMMENDED SAVINGS* $29,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $14,863 $294,000 $14,112
176,400
kWh
$657
-
kW-mo/yr
$94
-
MMBtu
02 2.2614: Use cooling tower or economizer to replace chiller cooling $11,030 $122,000 $10,928
136,597
kWh
$102
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,238 $4,250 $2,913
36,418
kWh
$325
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $247 $260 $247
3,088
kWh
- -
05 2.7444: Close holes and openings in building such as broken windows $203 $76 $129
1,615
kWh
- $74
-
MMBtu
TOTAL RECOMMENDED $29,581 $420,586 $28,330
354,118
kWh
$1,084
-
kW-mo/yr
$168
-
MMBtu
TOTAL IMPLEMENTED $18,304 $298,326 $17,155
214,433
kWh
$982
-
kW-mo/yr
$168
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs