Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Construction machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0998 #08 Y:2018 Install compressor air intakes in coolest locations $3,330 $1,074
OK0998 #07 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $5,784 $2,853
OK0998 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $14,022 $13,860
OK0998 #05 Y:2018 Use waste heat from hot flue gases to preheat $4,207 $21,000
OK0998 #04 Y:2018 Analyze flue gas for proper air/fuel ratio $5,603 $400
OK0998 #03 Y:2018 Recover waste heat from equipment $24,407 $30,000
OK0998 #02 Y:2018 Install vinyl strip / high speed / air curtain doors $24,200 $6,920
OK0998 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $92,926 $356,802
BS0114 #07 Y:2018 Use solar heat to make electricty $8,591 $166,500
BS0114 #06 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $304 $337
BS0114 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $601 $7
BS0114 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,503 $11,880
BS0114 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $423 $250
BS0114 #02 Y:2018 Convert to electrostatic powder coating $26,520 $21,600
BS0114 #01 Y:2018 Use waste heat from hot flue gases to preheat $4,222 $21,742
OR0700 #03 Y:2018 Reposition oven walls to reduce heated space $2,175 $5,389
OR0700 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $3,059 $6,826
OR0700 #01 Y:2018 Train operators for maximum operating efficiency $7,430 $1,495
NC0582 #12 Y:2016 Use closed cycle process to minimize waste water production $7,886 $4,100
NC0582 #11 Y:2016 Develop a repair/replace policy $1,782 $5,865