ITAC Assessment: OK0998
ITAC logo
ITAC Assessment: OK0998
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product skid steers and compact loaders
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 500,000
ft2
Annual Production 17,500
units
Production Hrs. Annual 4,680
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,467 10,819,200
kWh
Electricity Demand $503,049 25,317
kW-mo/yr
Natural Gas $231,639 72,863
MMBtu
TOTAL YEARLY COSTS $1,171,155
RECOMMENDED SAVINGS* $192,111 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $92,926 $356,802 $50,245
1,256,123
kWh
$42,681
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $24,200 $6,920 - - - $24,200
-
MMBtu
03 2.2437: Recover waste heat from equipment $24,407 $30,000 - - - $24,407
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,603 $400 - - - $5,603
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $4,207 $21,000 - - - $4,207
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,022 $13,860 $14,022
350,550
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,784 $2,853 $5,784
144,612
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $3,330 $1,074 $1,464
36,598
kWh
$1,866
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,516 - $1,516
37,908
kWh
- - -
10 2.3212: Optimize plant power factor $11,401 $14,332 - - $11,401 -
11 2.7232: Replace existing hvac unit with high efficiency model $2,712 - $2,712
67,790
kWh
- - -
12 2.7224: Reduce space conditioning during non-working hours $2,003 - $1,367
34,167
kWh
- - $636
-
MMBtu
TOTAL RECOMMENDED $192,111 $447,241 $77,110
1,927,748
kWh
$44,547
-
kW-mo/yr
$11,401 $59,053
-
MMBtu
TOTAL IMPLEMENTED $16,720 $4,327 $8,615
215,377
kWh
$1,866
-
kW-mo/yr
- $6,239
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs