Assessment Year | 2018 |
---|---|
Principal Product | skid steers and compact loaders |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
500,000
ft2
|
Annual Production | 17,500
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $436,467 | 10,819,200 |
kWh
|
$0.040 |
Electricity Demand | $503,049 | 25,317 |
kW-mo/yr
|
$19.87 |
Natural Gas | $231,639 | 72,863 |
MMBtu
|
$3.18 |
TOTAL YEARLY COSTS | $1,171,155 | |||
RECOMMENDED SAVINGS* | $192,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,720 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $92,926 | $356,802 |
$50,245
1,256,123
kWh
|
$42,681
-
kW-mo/yr
|
- | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $24,200 | $6,920 | - | - | - |
$24,200
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $24,407 | $30,000 | - | - | - |
$24,407
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,603 | $400 | - | - | - |
$5,603
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,207 | $21,000 | - | - | - |
$4,207
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,022 | $13,860 |
$14,022
350,550
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,784 | $2,853 |
$5,784
144,612
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $3,330 | $1,074 |
$1,464
36,598
kWh
|
$1,866
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,516 | - |
$1,516
37,908
kWh
|
- | - | - | |
10 | 2.3212: Optimize plant power factor | $11,401 | $14,332 | - | - | $11,401 | - | |
11 | 2.7232: Replace existing hvac unit with high efficiency model | $2,712 | - |
$2,712
67,790
kWh
|
- | - | - | |
12 | 2.7224: Reduce space conditioning during non-working hours | $2,003 | - |
$1,367
34,167
kWh
|
- | - |
$636
-
MMBtu
|
|
TOTAL RECOMMENDED | $192,111 | $447,241 |
$77,110
1,927,748
kWh
|
$44,547
-
kW-mo/yr
|
$11,401 |
$59,053
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,720 | $4,327 |
$8,615
215,377
kWh
|
$1,866
-
kW-mo/yr
|
- |
$6,239
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs