ITAC Assessment: SJ0037
ITAC logo
ITAC Assessment: SJ0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product vegetable seeds
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 225,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,839 2,557,268
kWh
Electricity Demand $99,397 7,382
kW-mo/yr
Natural Gas $75,399 3,455
MMBtu
TOTAL YEARLY COSTS $468,635
RECOMMENDED SAVINGS* $51,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $4,094 $6,718 $3,515
30,562
kWh
$579
-
kW-mo/yr
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $5,561 $4,556 $5,561
48,355
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,297 $4,052 $5,297
46,065
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,703 $12,724 $2,939
25,553
kWh
$1,764
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,500 - $25,500
221,765
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $893 - $893
7,763
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,182 $12,705 $4,148
36,072
kWh
$1,034
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $382 $3,108 $382
3,321
kWh
-
TOTAL RECOMMENDED $51,612 $43,863 $48,235
419,456
kWh
$3,377
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs