ITAC Assessment: UK1515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Automotive Parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 236,000
ft2
Annual Production 10,066,880
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,217,337 24,346,747
kWh
Electricity Demand $380,527 49,100
kW-mo/yr
Electricity Fees $23,960 -
Natural Gas $443,443 77,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $179,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,141 $3,760 $2,668
53,353
kWh
$473
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,346 $11,375 $7,005
140,106
kWh
$2,341
-
kW-mo/yr
- - -
03 2.7124: Make a practice of turning off lights when not needed $597 - $597
11,941
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,105 $1,169 $428
8,564
kWh
$93
-
kW-mo/yr
- $606 $(-22.0)
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,215 - $4,215
84,276
kWh
- - - -
06 2.7311: Ventilation system to shut off when room is not in use $426 - $426
8,521
kWh
- - - -
07 2.2615: Clean condenser tubes $575 $500 $575
11,502
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,702 $1,700 $3,702
74,049
kWh
- - - -
09 2.4224: Upgrade controls on compressors $15,940 $12,750 $15,940
318,794
kWh
- - - -
10 2.5122: Replace high resistance ducts, pipes, and fittings $838 - $1,138
22,762
kWh
- - - $(-300.0)
11 3.1161: Eliminate/reduce an operation $144,648 - - - $144,648
-
MMBtu
- -
12 2.2442: Preheat combustion air with waste heat $4,162 $4,332 - - $4,162
-
MMBtu
- -
13 2.1131: Repair faulty insulation in furnaces, boilers, etc $976 $854 - - $976
-
MMBtu
- -
14 2.2135: Repair and eliminate steam leaks $10,160 $5,539 - - $10,160
-
MMBtu
- -
TOTAL RECOMMENDED $199,831 $41,979 $36,694
733,868
kWh
$2,907
-
kW-mo/yr
$159,946
-
MMBtu
$606 $(-322.0)
TOTAL IMPLEMENTED $179,303 $24,897 $20,328
406,553
kWh
$2,907
-
kW-mo/yr
$155,784
-
MMBtu
$606 $(-322.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs