Assessment Year | 2017 |
---|---|
Principal Product | Cabs for construction equipment |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
412,000
ft2
|
Annual Production | 11,000
pieces
|
Production Hrs. Annual | 3,200
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $375,470 | 7,374,165 |
kWh
|
$0.051 | |
Electricity Demand | $156,690 | 17,443 |
kW-mo/yr
|
$8.98 | |
Natural Gas | $191,447 | 34,431 |
MMBtu
|
$5.56 | |
Waste Disposal Costs | |||||
Water Disposal | $7,970 | 960 |
Tgal
|
$8.30 | |
TOTAL YEARLY COSTS | $731,577 | ||||
RECOMMENDED SAVINGS* | $197,948 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $173,377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $97,269 | $199,760 |
$66,250
1,301,565
kWh
|
$26,798
-
kW-mo/yr
|
- | - | - | - | $4,221 | |
02 | 2.7122: Disconnect ballasts | $6,320 | $550 |
$4,354
85,536
kWh
|
$1,734
-
kW-mo/yr
|
- | - | - | $232 | - | |
03 | 2.7124: Make a practice of turning off lights when not needed | $38,581 | $20,000 |
$36,630
719,646
kWh
|
- | - | - | - | - | $1,951 | |
04 | 2.7135: Install occupancy sensors | $8,560 | $17,350 |
$8,560
168,166
kWh
|
- | - | - | - | - | - | |
05 | 2.7134: Use photocell controls | $1,021 | $500 |
$1,021
20,060
kWh
|
- | - | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,983 | $200 |
$3,018
59,288
kWh
|
$745
-
kW-mo/yr
|
- | - | $(-300.0) | - | $(-480.0) | |
07 | 2.4226: Use / purchase optimum sized compressor | $11,603 | $500 |
$11,603
396,000
kWh
|
- | - | - | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,895 | $100 |
$2,321
45,607
kWh
|
$574
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.2437: Recover waste heat from equipment | $7,470 | $4,500 | - | - |
$7,470
-
MMBtu
|
- | - | - | - | |
10 | 2.8114: Change rate schedules or other changes in utility service | $11,578 | $500 |
$11,578
-
kWh
|
- | - | - | - | - | - | |
11 | 2.4151: Develop a repair/replace policy | $1,782 | $5,865 |
$1,066
20,937
kWh
|
$716
-
kW-mo/yr
|
- | - | - | - | - | |
12 | 3.4111: Use closed cycle process to minimize waste water production | $7,886 | $4,100 |
$(-41.0)
(-800)
kWh
|
$(-43.0)
-
kW-mo/yr
|
- |
$7,970
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $197,948 | $253,925 |
$146,360
2,816,005
kWh
|
$30,524
-
kW-mo/yr
|
$7,470
-
MMBtu
|
$7,970
-
Tgal
|
$(-300.0) | $232 | $5,692 | ||
TOTAL IMPLEMENTED | $173,377 | $244,675 |
$139,726
2,685,662
kWh
|
$28,259
-
kW-mo/yr
|
- | - | $(-300.0) | - | $5,692 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs