Assessment Year | 2018 |
---|---|
Principal Product | Excavator Attachments |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 41 |
Plant Area |
345,500
ft2
|
Annual Production | 114
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $67,557 | 764,027 |
kWh
|
$0.088 | |
Natural Gas | $18,559 | 2,240 |
MMBtu
|
$8.29 | |
LPG | $5,841 | 172 |
MMBtu
|
$33.96 | |
Fuel Oil #1 | $9,638 | 225 |
MMBtu
|
$42.84 | |
Waste Disposal Costs | |||||
Other Liquid (non-haz) | $34,573 | 610 |
gal
|
$56.68 | |
TOTAL YEARLY COSTS | $136,168 | ||||
RECOMMENDED SAVINGS* | $12,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $7,430 | $1,495 | - | - |
$7,430
-
gal
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,059 | $6,826 |
$3,189
39,123
kWh
|
- | - | $155 | $(-285.0) | |
03 | 2.5115: Reposition oven walls to reduce heated space | $2,175 | $5,389 | - |
$2,175
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $12,664 | $13,710 |
$3,189
39,123
kWh
|
$2,175
-
MMBtu
|
$7,430
-
gal
|
$155 | $(-285.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs