ITAC Assessment: OR0700
ITAC logo
ITAC Assessment: OR0700
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Excavator Attachments
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 345,500
ft2
Annual Production 114
units
Production Hrs. Annual 2,250
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,557 764,027
kWh
Natural Gas $18,559 2,240
MMBtu
LPG $5,841 172
MMBtu
Fuel Oil #1 $9,638 225
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $34,573 610
gal
TOTAL YEARLY COSTS $136,168
RECOMMENDED SAVINGS* $12,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.431: Train operators for maximum operating efficiency $7,430 $1,495 - - $7,430
-
gal
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,059 $6,826 $3,189
39,123
kWh
- - $155 $(-285.0)
03 2.5115: Reposition oven walls to reduce heated space $2,175 $5,389 - $2,175
-
MMBtu
- - -
TOTAL RECOMMENDED $12,664 $13,710 $3,189
39,123
kWh
$2,175
-
MMBtu
$7,430
-
gal
$155 $(-285.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs