Assessment Year | 1988 |
---|---|
Principal Product | POLYURETHAN RUBBERS |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 13,500,000
lb
|
Production Hrs. Annual | 0
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,376 | 1,043,963 |
kWh
|
$0.093 |
Natural Gas | $28,773 | 5,887 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,809 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $530 | - |
$530
5,569
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,200 | $478 |
$4,200
-
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,963 | $13,100 |
$17,993
192,849
kWh
|
$(-4,030.0)
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,646 | $500 | - |
$1,646
-
MMBtu
|
|
TOTAL RECOMMENDED | $20,339 | $14,078 |
$22,723
198,418
kWh
|
$(-2,384.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,809 | $14,078 |
$22,193
192,849
kWh
|
$(-2,384.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs