ITAC Assessment: BS0114
ITAC logo
ITAC Assessment: BS0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Construction Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 181
Plant Area 153,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 4,100
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,961 1,959,520
kWh
Electricity Demand $30,651 5,149
kW-mo/yr
Electricity Fees $202 -
Natural Gas $78,996 13,617
MMBtu
LPG $22,398 336
MMBtu
Fuel Oil #2 $6,312 377
MMBtu
TOTAL YEARLY COSTS $245,520
RECOMMENDED SAVINGS* $45,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $4,222 $21,742 $(-334.0)
(-6,117)
kWh
$(-107.0)
-
kW-mo/yr
$4,663
-
MMBtu
- -
02 3.2121: Convert to electrostatic powder coating $26,520 $21,600 - - - - $26,520
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $423 $250 $322
5,899
kWh
$101
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,503 $11,880 $(-689.0)
(-12,632)
kWh
$(-471.0)
-
kW-mo/yr
- $5,663
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $601 $7 $601
11,017
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $304 $337 $304
5,565
kWh
- - - -
07 2.9114: Use solar heat to make electricty $8,591 $166,500 $8,591
157,396
kWh
- - - -
TOTAL RECOMMENDED $45,164 $222,316 $8,795
161,128
kWh
$(-477.0)
-
kW-mo/yr
$4,663
-
MMBtu
$5,663
-
MMBtu
$26,520
TOTAL IMPLEMENTED $27,247 $22,187 $626
11,464
kWh
$101
-
kW-mo/yr
- - $26,520