Assessment Year | 2018 |
---|---|
Principal Product | Construction Equipment |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 181 |
Plant Area |
153,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 4,100
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,961 | 1,959,520 |
kWh
|
$0.055 |
Electricity Demand | $30,651 | 5,149 |
kW-mo/yr
|
$5.95 |
Electricity Fees | $202 | - |
|
- |
Natural Gas | $78,996 | 13,617 |
MMBtu
|
$5.80 |
LPG | $22,398 | 336 |
MMBtu
|
$66.66 |
Fuel Oil #2 | $6,312 | 377 |
MMBtu
|
$16.74 |
TOTAL YEARLY COSTS | $245,520 | |||
RECOMMENDED SAVINGS* | $45,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,247 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $4,222 | $21,742 |
$(-334.0)
(-6,117)
kWh
|
$(-107.0)
-
kW-mo/yr
|
$4,663
-
MMBtu
|
- | - | |
02 | 3.2121: Convert to electrostatic powder coating | $26,520 | $21,600 | - | - | - | - | $26,520 | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $423 | $250 |
$322
5,899
kWh
|
$101
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,503 | $11,880 |
$(-689.0)
(-12,632)
kWh
|
$(-471.0)
-
kW-mo/yr
|
- |
$5,663
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $601 | $7 |
$601
11,017
kWh
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $304 | $337 |
$304
5,565
kWh
|
- | - | - | - | |
07 | 2.9114: Use solar heat to make electricty | $8,591 | $166,500 |
$8,591
157,396
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $45,164 | $222,316 |
$8,795
161,128
kWh
|
$(-477.0)
-
kW-mo/yr
|
$4,663
-
MMBtu
|
$5,663
-
MMBtu
|
$26,520 | ||
TOTAL IMPLEMENTED | $27,247 | $22,187 |
$626
11,464
kWh
|
$101
-
kW-mo/yr
|
- | - | $26,520 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs