ITAC Assessment: LS2212
ITAC logo
ITAC Assessment: LS2212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area 87,000
ft2
Annual Production 43,732,000
units
Production Hrs. Annual 5,720
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,244 6,626,400
kWh
Natural Gas $269,268 45,660
MMBtu
Waste Disposal Costs
Water Usage $14,146 6,467
Tgal
TOTAL YEARLY COSTS $843,658
RECOMMENDED SAVINGS* $24,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $572 - $572
6,767
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,007 $360 $2,007
23,740
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $545 $150 $545
6,451
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,453 $600 $1,453
17,189
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $468 $389
4,599
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $19,481 $28,000 - $19,481
-
MMBtu
TOTAL RECOMMENDED $24,447 $29,578 $4,966
58,746
kWh
$19,481
-
MMBtu
TOTAL IMPLEMENTED $3,513 $978 $3,513
41,557
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs