ITAC Assessment: ME0250
ITAC logo
ITAC Assessment: ME0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 32,000
ft2
Annual Production 840,000
Tgal
Production Hrs. Annual 3,600
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,911 533,705
kWh
Electricity Demand $20,266 1,447
kW-mo/yr
Electricity Fees $3,843 -
Natural Gas $33,085 7,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 4.441: Install automatic packing equipment $37,125 $1,656 - - $37,125
02 2.2511: Insulate bare equipment $5,216 - - $5,216
-
MMBtu
-
03 2.6212: Turn off equipment during breaks, reduce operating time $3,849 - - $3,849
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $3,000 $1,000 - - $3,000
05 2.6232: Install set-back timers $2,760 $350 - $2,760
-
MMBtu
-
06 2.2511: Insulate bare equipment $2,390 - - $2,390
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $1,560 $354 - - $1,560
08 2.2437: Recover waste heat from equipment $927 $400 $927
64,771
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $540 - $540
7,620
kWh
- -
10 4.821: Pay bills on time to avoid late fees $430 $184 - - $430
11 2.2511: Insulate bare equipment $427 - - $427
-
MMBtu
-
TOTAL RECOMMENDED $58,224 $3,944 $1,467
72,391
kWh
$14,642
-
MMBtu
$42,115
TOTAL IMPLEMENTED $58,224 $3,944 $1,467
72,391
kWh
$14,642
-
MMBtu
$42,115
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs