Assessment Year | 1995 |
---|---|
Principal Product | Containers |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
92,000
ft2
|
Annual Production | 71,200,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $459,092 | 10,007,913 |
kWh
|
$0.046 |
Natural Gas | $27,807 | 3,743 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,348 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $257 | $1,303 |
$257
10,844
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $400 | $456 |
$400
16,999
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $2,424 | $748 | - |
$2,424
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $977 | $500 |
$977
41,325
kWh
|
- | |
05 | 2.4314: Use synthetic lubricant | $3,310 | - |
$3,310
140,387
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $302 | - |
$302
12,896
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $1,307 | $858 | - |
$1,307
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $1,907 | $2,028 |
$1,907
80,891
kWh
|
- | |
09 | 2.7224: Reduce space conditioning during non-working hours | $8,812 | $900 | - |
$8,812
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,696 | $6,793 |
$7,153
303,342
kWh
|
$12,543
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,348 | $2,703 |
$1,536
65,065
kWh
|
$8,812
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs