Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Construction machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0206 #03 Y:2015 Eliminate or reduce compressed air usage $1,082 $2,600
MZ0206 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,931 $890
MZ0206 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,668 $6,475
IA0543 #08 Y:2015 Install occupancy sensors $323 $290
IA0543 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $503 $70
IA0543 #06 Y:2015 Eliminate or reduce compressed air usage $576 $500
IA0543 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $732 $203
IA0543 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $792 $3,266
IA0543 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,799 $4,205
IA0543 #02 Y:2015 Install occupancy sensors $1,917 $4,772
IA0543 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,975 $37,170
WM0051 #09 Y:2014 Replace boiler $11,306 $16,000
WM0051 #08 Y:2014 Use cooling tower or economizer to replace chiller cooling $14,378 $3,000
WM0051 #07 Y:2014 Preheat combustion air with waste heat $9,345 $35,000
WM0051 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $18,680 $5,175
WM0051 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $4,680 $3,200
WM0051 #04 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $13,050 $225
WM0051 #03 Y:2014 Insulate bare equipment $2,736 $800
WM0051 #02 Y:2014 Install occupancy sensors $15,358 $6,250
WM0051 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $46,648 $27,260