Assessment Year | 2016 |
---|---|
Principal Product | Boom Lifts and Telehandlers |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $1 M to 5M |
# of Employees | 1,343 |
Plant Area |
557,000
ft2
|
Annual Production | 500
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,159,617 | 21,123,826 |
kWh
|
$0.055 |
Natural Gas | $623,070 | 125,547 |
MMBtu
|
$4.96 |
TOTAL YEARLY COSTS | $1,782,687 | |||
RECOMMENDED SAVINGS* | $189,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $82,641 | $202,000 |
$82,641
1,505,304
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,898 | $72,687 |
$33,898
617,449
kWh
|
- | - | |
03 | 2.1221: Replace obsolete burners with more efficient ones | $15,212 | $35,900 | - |
$15,212
-
MMBtu
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $11,228 | $2,417 |
$11,228
204,525
kWh
|
- | - | |
05 | 2.4157: Establish a predictive maintenance program | $9,595 | $1,000 |
$10,478
190,851
kWh
|
- | $(-883.0) | |
06 | 2.4224: Upgrade controls on compressors | $8,986 | $20,750 |
$8,986
163,682
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $8,138 | $4,160 |
$8,138
148,236
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,301 | $4,100 | - |
$5,451
-
MMBtu
|
$(-150.0) | |
09 | 2.2522: Isolate hot or cold equipment | $4,874 | $5,100 |
$(-478.0)
(-8,712)
kWh
|
$5,352
-
MMBtu
|
- | |
10 | 2.4151: Develop a repair/replace policy | $3,084 | $665 |
$3,184
57,996
kWh
|
- | $(-100.0) | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,697 | $300 |
$2,697
49,126
kWh
|
- | - | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,004 | $2,230 | - |
$2,004
-
MMBtu
|
- | |
13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $770 | $2,150 |
$770
14,021
kWh
|
- | - | |
14 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $558 | - |
$558
10,155
kWh
|
- | - | |
15 | 2.2511: Insulate bare equipment | $218 | $470 | - |
$218
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $189,204 | $353,929 |
$162,100
2,952,633
kWh
|
$28,237
-
MMBtu
|
$(-1,133.0) | ||
TOTAL IMPLEMENTED | $79,264 | $117,819 |
$62,813
1,144,123
kWh
|
$17,434
-
MMBtu
|
$(-983.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs