Assessment Year | 2015 |
---|---|
Principal Product | Stationary and mobile concrete mixers |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
117,480
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,863 | 1,111,250 |
kWh
|
$0.057 |
Electricity Demand | $13,610 | 3,120 |
kW-mo/yr
|
$4.36 |
Natural Gas | $38,058 | 6,741 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,975 | $37,170 |
$12,157
211,432
kWh
|
$3,818
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $1,917 | $4,772 |
$1,917
33,346
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,799 | $4,205 |
$1,799
31,292
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $792 | $3,266 |
$583
10,140
kWh
|
$209
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $732 | $203 |
$544
9,464
kWh
|
$188
-
kW-mo/yr
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $576 | $500 |
$240
4,170
kWh
|
$336
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $503 | $70 |
$377
6,552
kWh
|
$126
-
kW-mo/yr
|
|
08 | 2.7135: Install occupancy sensors | $323 | $290 |
$323
5,616
kWh
|
- | |
TOTAL RECOMMENDED | $22,617 | $50,476 |
$17,940
312,012
kWh
|
$4,677
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs