ITAC Assessment: IA0090
ITAC logo
ITAC Assessment: IA0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 184,000
ft2
Annual Production 67,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,782 8,619,871
kWh
Natural Gas $195,826 68,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $19,385 $17,738 $19,385
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,489 $500 $10,489
257,034
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,257 $50 $6,257
153,283
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,368 $1,803 $7,368
179,660
kWh
-
05 2.7135: Install occupancy sensors $578 $997 $578
14,068
kWh
-
06 2.1213: Direct warmest air to combustion intake $4,490 $12,600 - $4,490
-
MMBtu
07 2.2122: Install / repair insulation on condensate lines $918 $373 - $918
-
MMBtu
TOTAL RECOMMENDED $49,485 $34,061 $44,077
604,045
kWh
$5,408
-
MMBtu
TOTAL IMPLEMENTED $42,650 $33,014 $37,242
436,694
kWh
$5,408
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs