Assessment Year | 2012 |
---|---|
Principal Product | Automotive throttle assemblies |
NAICS | 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
Sales Range | $50 M to 100M |
# of Employees | 330 |
Plant Area |
300,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $719,537 | 15,892,600 |
kWh
|
$0.045 |
Electricity Demand | $530,293 | 30,994 |
kW-mo/yr
|
$17.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,375 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,477 | $67,898 |
$13,118
289,763
kWh
|
$12,109
-
kW-mo/yr
|
- | $250 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $44,453 | $152,640 |
$21,500
474,922
kWh
|
$19,848
-
kW-mo/yr
|
- | $3,105 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,925 | $8,552 |
$5,061
111,803
kWh
|
$4,673
-
kW-mo/yr
|
- | $191 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,710 | $4,085 |
$1,106
24,426
kWh
|
$1,021
-
kW-mo/yr
|
- | $583 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,052 | $1,980 |
$329
7,260
kWh
|
$465
-
kW-mo/yr
|
- | $258 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,036 | $624 |
$306
6,763
kWh
|
$149
-
kW-mo/yr
|
- | $581 | |
07 | 2.7135: Install occupancy sensors | $222 | $300 |
$222
4,912
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,985 | $600 |
$1,864
41,179
kWh
|
$1,721
-
kW-mo/yr
|
$(-300.0) | $(-300.0) | |
09 | 2.4239: Eliminate or reduce compressed air usage | $313 | $750 |
$230
5,040
kWh
|
$83
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $88,173 | $237,429 |
$43,736
966,068
kWh
|
$40,069
-
kW-mo/yr
|
$(-300.0) | $4,668 | ||
TOTAL IMPLEMENTED | $83,375 | $230,740 |
$41,995
927,619
kWh
|
$38,434
-
kW-mo/yr
|
$(-300.0) | $3,246 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs